Wondering how long the house will be upside down? Here are typical timelines for the jobs we do most, and the reasons they take as long as they do.

We answer 24/7 and book walk-throughs on the first call.

By Douglas Woodruff, Painting Guides Editor · Updated September 2026

How long painting takes: a Men In Paint guide for Naperville homeowners

Guide

How long painting takes

By Douglas Woodruff · September 2026

Short answer

A bedroom with walls only is usually a one-day paint job in Naperville, IL, a kitchen cabinet repaint takes about a week, a staircase three to five days, and a full two-story exterior about one to two weeks, weather permitting. Drying time between coats, not brushwork, sets most of these schedules.

Part 1

Why drying time sets the schedule

Most painting is two coats over prep and primer, and each layer has to dry before the next goes on. Joint compound, primer and paint all have their own drying times, and enamels and clear finishes take longer than wall paint.

So a job that looks like a few hours of rolling can span days. Rushing a coat onto a soft one is how you get peeling, sagging and marks that never go away.

Part 2

Interior rooms

A bedroom with walls only is usually one day. Add the ceiling, the trim and the doors and it runs to about two. A whole-house interior is scheduled room by room, often over one to two weeks, so you can keep living in it. Our interior painting page covers the order of work.

Empty houses before a move-in go fastest, because several rooms can be worked at once with nothing to move or cover.

Bedroom between coats with the furniture covered

Part 3

Cabinets, stairs and trim

Kitchen cabinets take about a week from teardown to rehang, because doors are primed and sprayed in stages and enamel needs time to cure. A staircase usually takes three to five days, worked in stages so there is always a way up and down.

Trim and doors throughout a house are often two to four days on their own, depending on how many doors there are and whether oak is being primed for white.

Cabinet doors drying between enamel coats

Want a schedule for your job? Call and we will give you real dates after a walk-through.

Call (630) 467-7456
Naperville colonial at dusk with fresh taupe paint
Drying time between coats is built into every schedule we write.

Part 4

Ceilings, wallpaper and popcorn

A standard ceiling is a few hours; a two-story foyer takes a day or more with scaffold set-up. Wallpaper removal in a typical room is one to three days, depending on how the paper was hung. Popcorn removal runs two to four days per room once skim coats and paint are included.

These jobs are mostly drying time: compound and primer need to set before the next step.

Part 5

Exteriors and the weather

A typical two-story house exterior takes about one to two weeks, depending on size, prep and weather. Rain days and cold nights push the schedule, because paint needs a dry surface and time to cure. Trim-only jobs and front doors are much shorter; a front door is usually one day.

Exterior work runs from late April through October here, so spring and fall dates come with a weather window rather than a fixed day.

Exterior repaint in progress with one side finished

Part 6

Floors, decks and fences

A garage floor epoxy job takes two to three days, and cars usually wait several more days while the topcoat cures. Decks and fences need a wash, a couple of days to dry and then a day or two of staining, with dry weather on both ends.

When several jobs are booked together, such as washing, wood repair and painting, they are sequenced so each one is ready for the next.

Part 7

What slows a job down

The most common delay is damage found during prep: soft wood behind trim, water-stained drywall or loose plaster that has to be fixed before paint. Big color changes add coats, and older paint may need a bonding primer that was not obvious until testing.

Weather is the other factor outside, and occupied rooms slow things inside because furniture has to be moved and covered each day. A good schedule builds in drying time and a weather window, and you should be told the same day if anything changes it.

Straight answers

Questions this guide gets

Ask a painter

Answering now

Talk it through with a painter in Naperville

Call any hour. We answer questions on the phone and book a walk-through when you are ready.

Call a painter, any hour(630) 467-7456Browse services

One number, both offices

Call and find us in Naperville

Hours
Phones answered 24 hours a day, every day
Service office
1142 E Bailey Rd, Naperville, IL 60565
Head office
1476 Candlewood Dr, Crystal Lake, IL 60014
Coverage
Naperville and the western and northwest suburbs. Counties and towns we cover
Call (630) 467-7456

1142 E Bailey Rd
Naperville, IL

Call (630) 467-7456